Mechanical installation of the remaining 2 turbines has been completed and they have been connected to the grid. Currently, all 6 turbines are producing energy, although some of them are still in the testing phase, undergoing the so-called Trial Run, which consists in uninterrupted operation for 240 hours. During one month DK has produced 2.3GWh of energy despite the fact that it was in the start-up phase and was operating at ca. 40% efficiency. This energy is enough to cover the annual demand of 530 households.