On 14th of February delivery and installation of VESTAS V126 wind turbines with a capacity of 3.45MW each started. A powerful caterpillar crane with a lifting capacity of over 600t of SARENS company is used for the installation. On 17th of February DK Wind Farm received from ENERGA-OPERATOR S.A. the permission for voltage injection (EON) on GPO 30/110kV (Main Receiving Point) and the object was connected to the National Power System.