An application was submitted to ENERGA-OPERATOR SA (EOP) for permission to apply for EON voltage at GPO 30/110kV (Main Receiving Point). Turbines are heading to Gdynia, route for turbines from Gdynia to Dobieszewo construction site is being prepared.