Construction and power engineering works related to the construction of GPO and MV cable lines have been completed. Acceptance documentation is being prepared in order to obtain from ENERGA-OPERATOR S.A. a permission to apply EON voltage to GPO 30/110kV (Main Receiving Point). The last wind turbine elements left China for Gdynia.